小姐一般不让嫖客干什么,日本理伦片午夜理伦片,亚洲一区波多野结衣在线 ,国产无套精品一区二区

Electrical Control System of Double-inlet and Double-outlet Coal Mill

Electrical control system of double-inlet and double-outlet coal mill includes low voltage cabinet for control auxiliary equipment, electrical ear measurement device for controlling and monitoring material position and differential pressure measurement device. Low voltage PLC cabinet is the core of control system control and monitors, the mill operation through receiving the entire signal and transmitting the signal to center control DCS system by bus interface. With the ladder diagram program required by equipment production technology, according to the input command signal, PLC shall judge and logical process and send relevant command to make sure all the parts of mill operate efficiently. 

 

NHI double-inlet and double-outlet coal mill electrical control system with advanced automatic control equipment can achieve the following function; mill can operate safely and continuously around 300 days with no faults. During the running of mill, wearing parts can be filled in with mill non-stop, and mill can response fast according to load variation. Mill can realize double-inlet and double-outlet, single-inlet and double-outlet and semi-grinding according to the requirement of boiler load. More than 400 NHI production coal mill electrical systems are in safe operation in the coal-fire power field in Southeast Asia and North America.

主站蜘蛛池模板: 沅陵县| 南川市| 宁乡县| 闽清县| 长沙市| 樟树市| 伊金霍洛旗| 大丰市| 盐池县| 珲春市| 茶陵县| 公安县| 大关县| 修武县| 元朗区| 汨罗市| 淮南市| 泾源县| 泗洪县| 潮州市| 通化市| 乐山市| 保定市| 金门县| 邻水| 武邑县| 伊川县| 习水县| 河北区| 朝阳县| 许昌县| 荆门市| 永福县| 冷水江市| 元谋县| 凉山| 新巴尔虎左旗| 马关县| 洛隆县| 偃师市| 罗源县|