小姐一般不让嫖客干什么,日本理伦片午夜理伦片,亚洲一区波多野结衣在线 ,国产无套精品一区二区

Dual-mode TBM

Dual-mode TBM is mainly applied to big geology difference, long distance construction of tunneling project. Dual-mode TBM in the construction can according to hydrogeological condition change mode, to achieve that improve the rate of construction and reduce the cost of construction. Dual mode TBM has two type deslag mode or two type pressure balance mode’s full fracture surface TBM. Currently, have earth pressure, slurry Dual-mode TBM and earth pressure, rock Dual-mode TBM.

Dual-mode TBM which is produced by our company is a kind of derived equipment between balance TBM and shield rock TBM, have two different type TBM’s technical feature at the same time. When construction section geology appear large change, TBM handover suitable working mode, can make sure the safety and rate of construction, and can make sure the efficiency of whole construction. Currently, our company has produced more than 10 sets of such type TBM, mainly exported to Middle East.

TEL:+86 24 67859165;+86 24 67859170.E-mail:nhi-international@nhi.com.cn

 

主站蜘蛛池模板: 宾阳县| 岳阳市| 辛集市| 礼泉县| 稻城县| 蒙城县| 定陶县| 福清市| 阿合奇县| 呼伦贝尔市| 新闻| 华宁县| 漠河县| 红河县| 浮山县| 平乐县| 大方县| 西藏| 定陶县| 岳阳市| 冕宁县| 涿州市| 海阳市| 彝良县| 化隆| 综艺| 林甸县| 广水市| 吉隆县| 扶风县| 从江县| 吴旗县| 乌苏市| 清徐县| 来安县| 樟树市| 宜章县| 东兰县| 泸西县| 恩施市| 乌兰浩特市|